冷卻塔運(yùn)行保養(yǎng)方法:
1:進(jìn)行前,需將冷卻塔水盤和塔體內(nèi)部雜物清除干凈;
2:傳動皮帶過緊會導(dǎo)致軸承損壞,過松則會導(dǎo)致皮帶打滑發(fā)熱從而降低耐久度;
3:冷卻塔經(jīng)過一個星期運(yùn)轉(zhuǎn)后,必須重新更換循環(huán)水,以便清除管路中之塵垢雜物;
4:冷卻塔經(jīng)過5-6天的運(yùn)轉(zhuǎn),若皮帶出現(xiàn)松弛的話,需重新調(diào)整皮帶的松緊度;
5:冷卻塔若*停機(jī)時,應(yīng)松開皮帶,使之避免承受不必要的張力;
6:冬季、冷卻塔若*停機(jī)時,必須將管路之循環(huán)水全部排除,避免冬季結(jié)冰造成龜裂,冷水盤之排水管隨時打開,以便雨水、溶雪能夠流出;
7:日常運(yùn)行時,應(yīng)留意冷卻塔底盤中的水位。冷水盤水位需保持一定高度;
8:冷卻塔在停機(jī)一段時間后重新運(yùn)轉(zhuǎn),此時必須檢查馬達(dá)絕緣是否正常。

揭陽冷卻水塔圓形的,榕城冷卻水塔圓形的,普寧冷卻水塔圓形的
冷卻塔填料清潔辦法(一):
1、人工清掃冷卻塔內(nèi)脫落的垢渣;
2、用高壓水槍反復(fù)沖刷填料,鏟除清潔下的污泥水垢等;
3、用50℃擺布熱水將TNB安全除垢劑溶解后用沖刷泵反復(fù)沖刷填料,直至水垢沖刷潔凈,一起參加滅藻劑,*殺滅生物藻類及;
4、承認(rèn)體系遍地悉數(shù)清潔潔凈后,排去污水;
5、用清水沖刷填料及塔身表里;
6、恢復(fù)體系遍地,補(bǔ)水即可運(yùn)用;
7、悉數(shù)恢復(fù)后,請需要清潔方管理人員檢驗;
8、撤離己方物品,清掃現(xiàn)場清潔;
9、工期:依據(jù)實際情況定。
冷卻塔填料清潔辦法(二):
1、暫時用塑料布建立一個大水池;
2、將清潔劑參加清水中;
3、將填料從冷卻塔中拆下來放入藥池中浸泡;冷卻塔廠
4、將浸泡潔凈的填料用清水沖刷潔凈后裝回冷卻塔;
5、用粘有藥劑的布放在冷卻塔補(bǔ)水器上,將補(bǔ)水器口浸泡疏通;
6、用同樣的辦法將冷卻塔底盤水垢進(jìn)行鏟除潔凈;
7、用清水沖刷填料及塔身表里;
8、恢復(fù)體系遍地,補(bǔ)水即可運(yùn)用;
9、工期:依據(jù)實際情況定。
Cooling tower packing cleaning method (1):
1, manual cleaning slag cooling tower off;
2, repeatedly washed with water cannons to eradicate the filler, clean sludge scale etc.;
3, in 50 degrees of hot water at the mercy of the TNB security remover dissolved in flushing pump washed repeatedly until the scale filler, rinse clean, join the algaecide, compley kill algae and biological;
4, recognize the system clean and clean everywhere, drained sewage;
5, wash with water and packing inside and outside the tower;
6, restore the system everywhere, replenishment can be used;
7, after full restoration, please clean the party manager inspection;
8, one's own evacuation items, cleaning cleaning;
9, duration: Based on the actual situation.
Cooling tower packing cleaning method (two):
1, the temporary use of plastic sheeting to build a large pool;
2, will clean agent to participate in clear water;
3, the packing from the cooling tower removed into the drug tank soak; cooling tower factory
4, soak clean packing with clean water after cleaning back to the cooling tower;
5, with adhesive cloth on the cooling tower water supply device, will water supply device mouth soak dredge;
6, in the same way the cooling tower chassis to eradicate clean scale;
7, wash with water and packing inside and outside the tower;
8, restore the system everywhere, replenishment can be used;
9, duration: Based on the actual situation.